Top Stories
Aravana production resumes at Sabarimala
The unit will initially produce around 1.5 lakh tins a day, with output expected to rise to around 3.5 lakh tins daily after October 20. At full capacity, the plant can produce between 3.25 lakh and 3.65 lakh tins a day, TDB said.

The unit will initially produce around 1.5 lakh tins a day, with output expected to rise to around 3.5 lakh tins daily after October 20. At full capacity, the plant can produce between 3.25 lakh and 3.65 lakh tins a day, TDB said.
🔥 Get India’s hottest story up to 4× a day, plus a daily alert on your rights.
📡 Verified Wire Agency
Original Resource
Comments 0