Top Stories
CMRS likely to inspect 7.5-km Pink Line elevated section in Bengaluru from October 6 to 8
The inspection will cover the stretch between Kalena Agrahara and Tavarekere stations

The inspection will cover the stretch between Kalena Agrahara and Tavarekere stations
📡 Verified Wire Agency
Original Resource
Comments 0